Showing Results 1 to 10 of 23

Will a Partial Valve Stroke Testing lead to a higher SIL?

Will a Partial Valve Stroke Testing lead to a higher SIL? This question has been discussed by our very own Hassan El-Sayed (Team Lead, Functional Safety) at the HazardEx 2016 conference.

What Do I Need to Do to Declare Conformity to Directive 2014/34/EU

A guidance document explaining the basic requirements of compliance to ATEX Directive 2014/34/EU.

Submission of ATEX Technical Files

The key components that make up an ATEX Technical File, and the process for storing it.

Non-electrical equipment in hazardous areas (ATEX)

Outlining the process and requirements for compliance of mechanical equipment under Directive 2014/34/EU

Ex p - Certification and Testing Requirements

The main certification and test requirements for protection method Ex p - Purge and Pressurised

Ex ia - Certification and Testing Requirements

The main certification and test requirements for protection method Ex ia - Intrinsic Safety

Ex e - Certification and Testing Requirements

The main certification and test requirements for protection method Ex e - Increased Safety

Ex d - Certification & Testing Requirements

The main certification and test requirements for protection method Ex d - Flameproof

Electrostatic Spraying Equipment

The main certification requirements for Ex electrostatic spraying equipment

Changes to ATEX Technical Standards

What to do when the standards your ATEX product is certified against change